Carry This
One sentence worth memorizing.
Power, chips, and data centers, explained from the ground up for rural America.
Data centers are heading for rural counties. Some of the fears about them are overstated, and some are exactly right. Grid & Grain tells the difference out loud, with sources, then shows your community what to ask for if it decides to say yes. For county leaders, co-op members, farmers, and rural hospital teams.
Who's behind this. Grid & Grain is the free education series of Get Rural America Done, a rural health and Critical Access Hospital modernization practice founded by Aldrich K. Wooden, Sr., U.S. Army veteran. It takes no money from data center developers or utilities, and it never sells you anything. Earl, our explainer, is an AI character.
Every week on LinkedIn, Facebook, YouTube, and X, and every month in your inbox.
One sentence worth memorizing.
A claim people make, its verdict, the evidence, and what to ask for.
One idea at five levels, sixth grade to Ph.D.
Our AI lineman answers a real question.
A measurement on a kitchen-table data center, or a rural AI story.
Every module ships with a long read, an audio version, a five-question self-check, a bench-test video, and a one-page County Kit. Pass all twelve self-checks to earn the free Grid & Grain Field Certificate.
How power gets to you, and why your co-op is yours. Kit: Know Your Utility fact sheet.
Large-load tariffs and co-op annual meetings. Kit: large-load tariff checklist.
Chips, heat, and reading an energy claim critically. Kit: questions to ask about a power estimate.
Cooling design, not size, decides water use. Kit: water disclosure checklist.
Writing or reviewing a zoning ordinance. Kit: model ordinance terms.
AI tools a Critical Access Hospital can use, and what they need. Kit: CAH AI readiness checklist.
Batteries, solar, and the grid's worst hour. Kit: flexibility terms to require.
Few jobs, good jobs, and who gets them. Kit: workforce clause.
Precision ag, farm data, and edge computing. Kit: farm data and connectivity checklist.
Community benefit agreements, for National Co-op Month. Kit: benefit agreement term sheet.
Shared regional computing for public services. Kit: regional compute co-op concept sheet.
Putting it together into a 12-month county plan. Kit: County AI Infrastructure Plan template.
We grade the claim, never the person. Figures are dated to their sources and rechecked before reuse. Last reviewed November 2026.
An EPRI-led causal study (2015–2024) found a doubling of data center capacity lowered residential prices about 4% (EPRI). A Wharton and Harvard Business School paper attributes about 4% of the 2020–2025 residential price rise to data centers, and 15% of the industrial rise. Effects concentrate in tight markets such as PJM (E&E News).
Ask for: a large-load tariff with a separate rate class, minimum bills, long contracts, exit fees, and prepaid upgrades.
Evaporative designs can use up to 5 million gallons a day. A closed-loop campus in Port Washington, Wisconsin, plans a peak near 22,000 gallons a day, about 65 homes (Vantage). About three-quarters of the U.S. data center water footprint sits upstream at power plants (Siddik et al., 2021).
Ask for: cooling type, peak and average gallons, water source, and a drought curtailment clause.
Rural facilities often employ fewer than 100 permanent workers, and specialized services come from outside the county (Georgia Tech via Futurity). Construction jobs are real but temporary.
Ask for: local-hire targets, apprenticeships, and a community college partnership, in writing.
It can: Loudoun County, Virginia, reports the industry generates nearly half its property tax revenue. Abatements can erase much of it: El Paso granted an 80% property tax abatement over 35 years (Brookings).
Ask for: the abatement terms and the net revenue to each taxing district, school board first.
Readings next to machines don’t equal levels at a home (Linn Valley FAQ). But noise complaints are real: neighbors in Vineland, New Jersey, have sued over round-the-clock noise. Sanford, North Carolina, caps data centers at 65 dBA at the property line (NC Newsline).
Ask for: a dBA limit at the property line, low-frequency measurement, setbacks, generator test hours, and third-party monitoring.
U.S. data centers used 4.4% of U.S. electricity in 2023, with a 2028 range of 6.7% to 12% (Lawrence Berkeley National Laboratory, 2024). Nearly half of U.S. capacity sits in five regional clusters (International Energy Agency, 2025), so the local share is what matters.
Ask for: the share of your utility’s or co-op’s peak demand a project would be.
As of May 2026, 23 states had approved at least one large-load tariff (Columbia Sabin Center). Frederick County, Maryland, negotiated more than $110 million in developer-funded benefits (MACo). Arizona’s co-ops won a framework that keeps large-load costs off existing members (ACC).
Learn the levers: zoning, utility tariffs, benefit agreements, and co-op board elections.
At Central Montana Medical Center, a 25-bed Critical Access Hospital, ambient AI scribing cut after-hours charting so much that some physicians said they’d consider leaving without it. Only about 8% of critical access and rural community hospitals use AI-driven predictive analytics (Becker’s).
Ask for: any local data center deal to include broadband and AI-readiness support for the hospital and schools.
From 2010 to 2018, global data center electricity rose only about 6% while computing grew about 6.5 times (Masanet et al., 2020, Science). AI broke that balance after 2017, and forecasts now span nearly a factor of two.
Ask for: low, base, and high scenarios in any utility plan, and who pays if demand lands low.
Local officials have been asked to sign nondisclosure agreements, and secrecy is a leading driver of opposition (Iowa Public Radio).
Ask for: a transparency clause: a named end user, a public hearing before any vote, and no NDAs for elected officials.